top of page

FORZA

MCF Electric was selected to complete the electrical infrastructure for the Forza Transportation facility, supporting the company’s growing logistics operations in Laredo, TX. This project involved the design, construction, and installation of critical power distribution systems to ensure long-term operational reliability.

 

The scope included the installation of underground conduit and distribution lines, as well as the main distribution panels responsible for powering the facility’s electrical system. To ensure backup power during outages, our team installed a 200-kilowatt Cummins diesel generator, mounted on a newly constructed reinforced concrete pad designed to meet structural and code requirements.

 

In addition, MCF Electric handled the installation of an ABB Zenith 800-amp 4-pole automatic transfer switch (ATS) to seamlessly manage the transition between utility power and generator power. The complete system was designed for durability, efficiency, and compliance with commercial standards.

 

The Forza Transportation Project highlights MCF Electric’s ability to deliver turnkey electrical solutions for industrial and logistics environments, combining power, protection, and precision.

bottom of page